Ciqurix – Fire Detection

SMS Projects Ltd is part of the Ciqurix Video Flame Detection Partner Program

THE ULTIMATE IN VIDEO FIRE DETECTION TECHNOLOGY 

CORE PERFORMANCE. 

CORE is a fire system which provides primary fire detection using multi-spectral video processing. All analytics are carried out onboard each detection device. CORE is designed for compliance to BS5839-1 (UK fire standard), uses fire-rated cabling, and will continue to operate from its internal battery supply for over 24 hours during power failure. 

FLEXIBLE SOLUTIONS. 

FLEX is a cctv system and is used for supplemental fire detection. Devices are connected using standard ethernet cabling and can potentially make use of existing network infrastructure (where suitable). 

HOW IT WORKS – FLAME DETECTION USING CIQURIX DUAL LENS TECHNOLOGY 

DUAL LENS TECHNOLOGY – Ciqurix detectors process visual and infrared images simultaneously, using analytics to identify the physical presence of a flame. It is not looking for by-products of a fire (be it smoke or temperature). The detectors are looking for colour, brightness, shape, flicker, movement – and they are looking for all of this over time. When enough of these things are present (not all of them necessarily, but enough of them) – a fire event is declared and actioned. 

Find out more


Traditional fire detection methods are facing significant challenges and failing to adapt. Buildings are increasing in size and complexity, industrial processes are no longer an excuse for slow or non-existent detection, and environmental concerns are necessitating fire detection in areas that were previously ignored. Ciqurix video flame detectors can recognise a fire at its inception and immediately raise the alarm. Using a combination of visual and infrared image processing, even small flames are located and detected over large distances in seconds. The system will rapidly detect fire almost anywhere. It is unaffected by dust, dirt, fumes, moisture, light levels, or temperature. 

The Ciqurix CORE system integrates seamlessly into other systems (fire alarm, automatic suppression, remote monitoring, etc) and can generate alerts in the way most suited to you and your business. Ciqurix systems are protecting facilities all over the world. Cost effective, simple to operate, and with proven reliability – why would you not use Ciqurix detectors to limit your exposure to the damaging effects of fire? The CORE system is the only video fire detection product that operates and functions as a recognised fire system, providing businesses around the globe peace of mind and a product that complies with fire standards. 

BROCHURES

Click image to view

CASE STUDIES

Click image to view

Find out more today – contact SMS Projects Ltd for more information