EmiControls

SMS Projects Limited has partnered with EmiControls to offer tailor-made solutions to fight dust, and odours – and we do it with the help of water mist. The small droplets of water achieve a far better effect than conventional methods because they create a larger water surface.
EmiControls in-depth know-how in mechanical engineering and, above all, in water atomization, has enabled unprecedented results in a wide variety of areas.
In dust suppression, the fine droplets of water combine with the dust particles and bring them to the ground. Optimal control of dust requires the correct distribution of the water droplets, and EmiControls have perfected this process.
The EmiControls odor control is already being used successfully in composting and recycling plants and creates a better environment for employees and neighbours.
Dust
Dust Suppression and Dust Abatement to reduce emissions
The topic of dust suppression has become enormously important in the last years – on the one hand, due to stricter requirements imposed by the authorities and on the other hand due to increasing environmental awareness.
We not only fight dust through competent consulting, plant engineering, and implementation of dust control systems but also offer a decisive added value for your company:
- Cost and time savings: maximum results thanks to minimum use of resources
- Happy employees, safe working conditions, and satisfied neighbors
- Better image thanks to the implementation of sustainable measures


ODOUR
Odour Control with Biological Fluid and Turbine
Many recycling yards, composting facilities, and landfills experience problems with unpleasant odours. EmiControls have developed an innovative solution for this problem: a misting system to suppress odours.
The idea to construct odour controllers came to EmiControls after they were contacted by a recycling yard in France. The owner was looking for a solution to an odour problem after neighbours in the area had made a complaint. Since there was still no suitable solution on the market, they set themselves the goal of developing the first pure odour controllers. The basis for this was a dust controller, which they then fitted with a dosing pump.
In 2014, the “Politecnico di Milano” University proved that the EmiControls solution can neutralize between 60-80% of unpleasant odours according to UNI EN 13725 standards. An excellent result.
Find out more today – contact SMS Projects Ltd for more information