EmiControls

EMiControls

SMS Projects Limited has partnered with EMiControls to offer tailor-made solutions to fight fires, dust, and odors – and we do it with the help of water mist. The small droplets of water achieve a far better effect than conventional methods because they create a larger water surface.

Our in-depth know-how in mechanical engineering and, above all, in water atomization, has enabled unprecedented results in a wide variety of areas.

Safety in firefighting – be it for emergency services or structural protection – can be increased enormously, thanks to water mist. This water mist quickly saps the energy from the fire and significantly increases the cooling effect.

In dust suppression, the fine droplets of water combine with the dust particles and bring them to the ground. Optimal control of dust requires the correct distribution of the water droplets, and we at EmiControls have perfected this process.

Our odor control is already being used successfully in composting and recycling plants and creates a better environment for employees and neighbors.

water mist fire

The common denominator for our solutions is water mist. We took advantage of the fact that tiny droplets dramatically increase the surface area of ​​the water used, and the atomization of water is our specialty. Meanwhile, using this technology, we manufacture products to solve various problems in firefighting, dust control, odor control and evaporation. 

Fire

Firefighting Turbines for Fire Protection and Mobile Firefighting

As water mist is an important element in the successful and efficient fight against fire, we have chosen the slogan “Small Drops, Big Impact.” Until now, however, its potential could only be exploited to a limited extent, as it was not possible to throw water mist at a long distance.

By combining it with a turbine, we at EmiControls have solved this problem. Back in 2011, we were able to organize the largest documented fire test with water mist in Europe. Even then it was clear: the water mist turbine represents a paradigm shift in fire fighting.

Today, everyone is talking about “sustainability” – we started investing in it more than a decade ago. After all, water mist turbines promise one thing in addition to high effectiveness: resource savings.

Our firefighting turbines can be used for both mobile firefighting and stationary fire protection. For mobile applications, the turbine is either mounted on a remotely controlled tracked vehicle or in a fire truck. For use as stationary fire protection, we position the turbine at a fixed location, where it can be immediately put into service in case of fire. 

Find out more

Dust

Dust Suppression and Dust Abatement to reduce emissions

The topic of dust suppression has become enormously important in the last years – on the one hand, due to stricter requirements imposed by the authorities and on the other hand due to increasing environmental awareness.

At EmiControls we not only fight dust through competent consulting, plant engineering, and implementation of dust control systems but also offer a decisive added value for your company:

  • Cost and time savings: maximum results thanks to minimum use of resources
  • Happy employees, safe working conditions, and satisfied neighbors
  • Better image thanks to the implementation of sustainable measures

For more than 10 years we have been helping customers all over Europe to suppress dust emissions. We are happy to be walking this important path with you as well.

Find out more

ODOUR

Odour Control with Biological Fluid and Turbine

Many recycling yards, composting facilities, and landfills experience problems with unpleasant odours. We have developed an innovative solution for this problem: a misting system to suppress odours. 

The idea to construct odour controllers came to us after we were contacted by a recycling yard in France. The owner was looking for a solution to an odour problem after neighbours in the area had made a complaint. Since there was still no suitable solution on the market, we set ourselves the goal of developing the first pure odour controllers. The basis for this was a dust controller, which we then fitted with a dosing pump.

In 2014, the “Politecnico di Milano” University proved that our solutions can neutralize between 60-80% of unpleasant odours according to UNI EN 13725 standards. An excellent result.

Find out more

Find out more today – contact SMS Projects Ltd for more information